The problem
Planning is where manufacturing either flows or stalls. When plans, bills of material and material requirements live in separate spreadsheets, they drift apart the moment demand shifts — and the shortage only shows up on the shop floor. This platform keeps planning, BOMs and MRP in step, so the plan and the materials behind it move together.
What it does
Production plans generated with backward and forward scheduling against confirmed demand.
Multi-level bills of material kept in sync so plans always reflect the real product structure.
Requirements calculated from demand and stock, netting off what is already available.
Raw material and bought-out items planned so lines are fed without over-ordering.
Purchase indents raised automatically from the requirements the plan creates.
Plans recalculated as demand changes, instead of drifting from a fixed spreadsheet.
How we build it
We start from an accurate, multi-level BOM — the backbone every plan depends on.
Planning and MRP calculations run on the system, not in a hand-maintained sheet.
When demand or stock moves, the plan and its material requirements move with it.
What changes